Violation Detail
Standard Cited: 19100147 C04 II A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1619056.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,813.00
Current Penalty: $7,813.00
Issuance Date: 02/09/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/06/2023
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 03/07/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/07/2023 | $7,813.00 | 03/06/2023 | Serious | |
| Penalty | Z: Issued | 02/09/2023 | $7,813.00 | 03/06/2023 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(A): The energy control procedures had not contained a specific statement on the intended use of the procedure: On or about September 1, 2022, employees were exposed to the unexpected start-up or release of stored energy while performing servicing and maintenance activities on the Fukui Presses, and the employer had not included a specific statement on the intended use of the procedures.
Translate