Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1615089.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 02/14/2023 2
Initial Penalty: $8,806.00
Current Penalty: $6,164.20
Issuance Date: 01/17/2023
Nr Instances: 2
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 02/08/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/08/2023 | $6,164.20 | 02/14/2023 | Serious | |
Penalty | Z: Issued | 01/17/2023 | $8,806.00 | 02/14/2023 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. On or about August 29, 2022, the employer failed to produce the established procedure so that an employee who was engaged in servicing and maintenance activities could follow the established control of hazardous energy procedure for replacing the Phoenix Power Supply in the Square D Test Cell Switch Gear (53104-1 Square D), located in the first level of the WEEP of the facility located at N7650 County Road LS, Haven, Wisconsin. b. On or about August 30, 2022, the employer failed to produce the established procedure so that an employee who was engaged in servicing and maintenance activities could follow the established control of hazardous energy procedure for replacing the Phoenix Power Supply in the Square D Test Cell Switch Gear (53104-1 Square D), located in the first level of the WEEP of the facility located at N7650 County Road LS, Haven, Wisconsin.