Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1612488.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/20/2023 2
Initial Penalty: $4,688.00
Current Penalty: $0.00
Issuance Date: 01/31/2023
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0111500
Contest Date: 03/20/2023
Final Order: 11/20/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/20/2023 | $0.00 | 03/20/2023 | Serious | |
Penalty | C: Contested | 03/30/2023 | $4,688.00 | 03/20/2023 | Serious | |
Penalty | Z: Issued | 01/31/2023 | $4,688.00 | 03/20/2023 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(f)(3):Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity as per reference 1910.27(a). BASKETBALL GYMNASIUM: On or about August 2, 2022, the employer had not conducted inspections on the Tallescope Upright scaffold prior to an employee using it to perform vent cleaning with a vacuum resulting in a fatal fall.