Violation Detail

Standard Cited: 19260451 B01 General requirements.

Inspection Nr: 1597171.015

Citation: 01001A

Citation Type: Serious

Abatement Status: Corrected During Inspection

Initial Penalty: $4,351.00

Current Penalty: $3,480.80

Issuance Date: 08/15/2022

Nr Instances: 2

Nr Exposed: 3

Abatement Date:

Gravity: 10

Report ID: 0626600

Contest Date:

Final Order: 09/16/2022

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 09/16/2022 $3,480.80   Serious  
Penalty Z: Issued 08/15/2022 $4,351.00   Serious  

Text For Citation: 01 Item/Group: 001A Hazard:

29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports. On or about May 19, 2022, employees were conducting masonry activities from an outrigger platform and scaffold work platforms on a tubular welded frame scaffold without the working level being fully planked.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.