Violation Detail
Standard Cited: 19100269 A02 II E Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1591289.015
Citation: 01001A
Citation Type: Serious
Abatement Status:
Initial Penalty: $14,502.00
Current Penalty: $0.00
Issuance Date: 10/06/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/01/2022
Gravity: 10
Report ID: 0112300
Contest Date: 10/31/2022
Final Order: 06/12/2023
Related Event Code (REC): I;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/12/2023 | $0.00 | 11/01/2022 | Serious | |
| Penalty | C: Contested | 11/01/2022 | $14,502.00 | 11/01/2022 | Serious | |
| Penalty | Z: Issued | 10/06/2022 | $14,502.00 | 11/01/2022 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(a)(2)(ii)(E): Each qualified employee was not trained and competent in the recognition of electrical hazards to which the employee may be exposed and the skills and techniques necessary to control or avoid these hazards: (a) Manchester Street Station - Generator #10: On or about 4/21/2022, each qualified employee was not adequately trained to understand the hazards involved with not properly reconnecting the grounds after performing testing and maintenance of generator #10 and in the skills and techniques necessary to control this hazard.
Translate