Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1576333.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $7,000.00
Issuance Date: 07/07/2022
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 08/04/2022
Gravity: 10
Report ID: 0521100
Contest Date: 07/28/2022
Final Order: 01/20/2023
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/20/2023 | $7,000.00 | 08/04/2022 | Serious | |
| Penalty | C: Contested | 07/29/2022 | $14,502.00 | 08/04/2022 | Serious | |
| Penalty | Z: Issued | 07/07/2022 | $14,502.00 | 08/04/2022 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i):The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. On or about February 22, 2022, with respect to an establishment located at 2121 Brooks Ave, Neenah, WI 54946, Neenah Enterprises, Inc. had not completed a periodic inspection of the energy control procedure for the Core Maker in Core Room 2 at least annually to ensure that the procedure and requirements of this standard were being followed.
Translate