Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1556845.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,357.00
Current Penalty: $14,357.00
Issuance Date: 02/11/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/24/2022
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 03/07/2022
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/07/2022 | $14,357.00 | 02/24/2022 | Serious | |
Penalty | Z: Issued | 02/11/2022 | $14,357.00 | 02/24/2022 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: Split Steel Cell - On or about October 7, 2021, the energy control procedures for the OJIM splitter machines did not clearly and specifically outline the steps for use and placement of wood blocking to isolate stored energy in the upper ram assembly.