Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1538407.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $10,000.00
Issuance Date: 11/19/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/10/2022
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 12/14/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/14/2021 | $10,000.00 | 01/10/2022 | Serious | |
| Penalty | Z: Issued | 11/19/2021 | $13,653.00 | 01/10/2022 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i)(C): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected. a) Plant/Building #8- On or about June 6, 2021, an authorized employee was required to perform servicing on the Poly-Cell Film Making Bubble Machine #2 Model#PCS-1930HPA. The employer did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected.
Translate