Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1527463.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,461.00
Current Penalty: $2,730.50
Issuance Date: 09/24/2021
Nr Instances: 4
Nr Exposed: 6
Abatement Date:
Gravity: 10
Report ID: 0419700
Contest Date: 11/12/2021
Final Order: 05/31/2023
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/31/2023 | $2,730.50 | Serious | ||
| Penalty | C: Contested | 11/19/2021 | $5,461.00 | Serious | ||
| Penalty | Z: Issued | 09/24/2021 | $5,461.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1):Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: a. On the second through fifth levels of the scaffold system, at 22 Ocean Ridge Boulevard North in Palm Coast Florida: On or about April 15, 2021, the employer failed to ensure that employees of subcontractor Isel Herrera were not exposed to a fall hazard up to 32 feet, in that the decking was not fully planked, leaving gaps between the scaffold sections.