Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1525146.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 09/28/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/16/2021
Gravity: 10
Report ID: 0111500
Contest Date:
Final Order: 10/27/2021
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/27/2021 | $13,653.00 | 11/16/2021 | Serious | |
Penalty | Z: Issued | 09/28/2021 | $13,653.00 | 11/16/2021 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. Solution Room 1- Reactor and Holding Tank 1: On or about April 13th 2021, the employer did not adequately develop and utilize a procedure to control the thermal and pressure hazards created when the operator drained hot water from the 3000 gallon tank during maintenance operations.