Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1520545.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,288.00
Current Penalty: $12,288.00
Issuance Date: 08/17/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/01/2021
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 09/14/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/14/2021 | $12,288.00 | 10/01/2021 | Serious | |
Penalty | Z: Issued | 08/17/2021 | $12,288.00 | 09/13/2021 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: a) Cutting Department - On or about March 18, 2021, an authorized employee performed a die set-up on the J. Bobst & Fils die cutter machine, serial no. 11839. The employer failed to provide a periodic inspection that included a review between the inspector and each authorized employee and the employee's responsibility under the energy control procedure.