Violation Detail
Standard Cited: 19100269 D08 I E Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1500643.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,728.00
Current Penalty: $7,510.00
Issuance Date: 04/22/2021
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 06/15/2021
Gravity: 5
Report ID: 0418200
Contest Date:
Final Order: 05/27/2021
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/27/2021 | $7,510.00 | 06/15/2021 | Serious | |
| Penalty | Z: Issued | 04/22/2021 | $10,728.00 | 05/18/2021 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(d)(8)(i)(E)): De-energization of all systems and reapplying of energy control measures was not done in accordance with paragraph (d)(6) of this section "established procedures for the application of energy control (the lockout of tag out procedures) to continue the servicing or maintenance". a) Lake Oliver Dam Turbine No. 2: On or about 10/27/2020, the employer exposed employees to caught-in hazards, in that procedures were not followed when removing and reapplying lock out for adjustments to the penstock priming valve in order to prevent pressure differentials from occurring at the valve.