Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1497407.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,557.00
Current Penalty: $5,000.00
Issuance Date: 03/18/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/13/2021
Gravity: 10
Report ID: 0336000
Contest Date:
Final Order: 03/29/2021
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/29/2021 | $5,000.00 | 04/13/2021 | Serious | |
| Penalty | Z: Issued | 03/18/2021 | $9,557.00 | 04/13/2021 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: A.) B&B Designed Systems, Inc., 18746 Mill Street, Meadville, PA 16335, on or about October 9, 2020 and times prior thereto: An employee was attempting to land and terminate a ground wire onto the ground bus in panel CXPN-99. A ground wire touched an energized power circuit within the electrical panel resulting in an arc flash. The electrical panel was not de-energized prior to the start of the work operations. ABATEMENT CERTIFICATION AND DOCUMENTATION REQUIRED: Abatement certification is required within 10 days after the abatement date noted on the citation. This certification shall include a statement that abatement is complete, the date abatement was completed, method of abatement, and state that employees and their representatives were informed of this abatement. IN ADDITION, abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic, or video evidence or abatement or other written records.