Violation Detail
Standard Cited: 19100036 G01 Design and construction requirements for exit routes.
Inspection Nr: 1487711.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,476.00
Current Penalty: $2,500.00
Issuance Date: 02/01/2021
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 03/23/2021
Gravity: 1
Report ID: 0111400
Contest Date:
Final Order: 03/17/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/17/2021 | $2,500.00 | 03/23/2021 | Serious | |
Penalty | Z: Issued | 02/01/2021 | $4,476.00 | 03/23/2021 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.36(g)(1): Projections from the ceiling were less than six feet eight inches (2.0 m) from the floor: Plant 3, IQF Room, Packing Area: An overhead conveyor system drops to approximately five (5) feet five (5) inches and runs parallel to the exit route from the packing area exposing employees to struck-by hazards.