Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1486093.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,390.00
Current Penalty: $6,234.20
Issuance Date: 11/03/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 11/23/2020
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 11/27/2020
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/27/2020 | $6,234.20 | 11/23/2020 | Serious | |
Penalty | Z: Issued | 11/03/2020 | $10,390.00 | 11/23/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures shall clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, the following: (A) A specific statement of the intended use of the procedure; (B) Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy; (C) Specific procedural steps for the placement, removal and transfer of lockout devices or tagout devices and the responsibility for them; and (D) Specific requirements for testing a machine or equipment to determine and verify the effectiveness of lockout devices, tagout devices, and other energy control measures. a) On or about July 28, 2020, the employer failed to develop an energy control procedure specifically for the Vecoplan Wood Pellet Mill.