Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1476544.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,205.00
Current Penalty: $4,000.00
Issuance Date: 10/21/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/05/2020
Gravity: 1
Report ID: 0524500
Contest Date:
Final Order: 11/18/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/18/2020 | $4,000.00 | 11/05/2020 | Serious | |
Penalty | Z: Issued | 10/21/2020 | $5,205.00 | 11/05/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On or about May 27, 2020, employees were exposed to tripping hazards while walking on the spider suspension scaffold and the employer did not ensure the spacing between scaffold platform decking was less than one inch.