Violation Detail
Standard Cited: 19100027 B02 V Scaffolds and rope descent systems.
Inspection Nr: 1472290.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,048.00
Current Penalty: $2,833.60
Issuance Date: 08/21/2020
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 09/22/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/22/2020 | $2,833.60 | Serious | ||
Penalty | Z: Issued | 08/21/2020 | $4,048.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.27(b)(2)(v): The employer must ensure that the rope descent system has proper rigging, including anchorages and tiebacks, with particular emphasis on providing tiebacks when counterweights, cornice hooks, or similar non-permanent anchorages are used: a) Jobsite located at 2 Scott Way Building #2, Lester, PA.: The employer did not ensure that the rope descent system was provided a tieback when utilizing a counterweight system. Documented to occur on or about 23 FEB 2020.