Violation Detail
Standard Cited: 19261425 C01
Inspection Nr: 1459694.015
Citation: 01001A
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $11,566.00
Current Penalty: $11,566.00
Issuance Date: 02/26/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity:
Report ID: 0936300
Contest Date: 03/20/2020
Final Order: 11/16/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 11/16/2020 | $11,566.00 | Other | ||
Penalty | C: Contested | 03/23/2020 | $11,566.00 | Serious | ||
Penalty | Z: Issued | 02/26/2020 | $11,566.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.1425(c)(1): The employer did not make sure that the materials being hoisted when employees were hooking, unhooking, or guiding the load were rigged to prevent unintentional displacement. Parking facility project: A Manitowoc crane was used to lift a temporary brace from the precast structure that was not rigged to prevent unintentional displacement, exposing employees to struck by hazards.