Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1459489.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 06/24/2020 2
Initial Penalty: $9,639.00
Current Penalty: $7,639.00
Issuance Date: 05/07/2020
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 06/02/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/02/2020 | $7,639.00 | 06/24/2020 | Serious | |
Penalty | Z: Issued | 05/07/2020 | $9,639.00 | 06/24/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: 300 Burnett Rd, Chicopee, MA: On January 30, 2020 and at times prior, the employer had not developed a written energy control procedure for the dual energy source S-244 machine to protect the employees who set up and maintained it. Additionally, some authorized employees did not use the available written energy control procedures when maintaining and servicing machines.