Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1455893.015
Citation: 01001A
Citation Type: Serious
Abatement Status:
Initial Penalty: $13,494.00
Current Penalty: $0.00
Issuance Date: 05/29/2020
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/12/2020
Gravity: 10
Report ID: 0523900
Contest Date: 06/22/2020
Final Order: 11/25/2020
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 03/23/2021 | $13,494.00 | 06/12/2020 | Serious | |
| Penalty | F: Formal Settlement | 11/25/2020 | $0.00 | 06/12/2020 | Serious | |
| Penalty | Z: Issued | 05/29/2020 | $13,494.00 | 06/12/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) Building 23, depalletizing robot cell; On or about January 9, 2020, the energy isolation (lockout) procedure was not used while maintenance operations were performed on the pusher table section of an automated depalletizing robot (Fanuc, model M410-iB, robot # 2). An employee injury occurred, which resulted in hospitalization.
Translate