Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1450726.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/19/2020 2
Initial Penalty: $10,603.00
Current Penalty: $10,603.00
Issuance Date: 03/10/2020
Nr Instances: 1
Nr Exposed: 16
Related Event Code (REC):
Gravity: 5
Report ID: 0524700
Contest Date:
Final Order: 04/08/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/10/2020 | $10,603.00 | 03/19/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. a. Pentair Flow Technologies, LLC located in Ashland, OH: On or about December 4, 2019 the employer did not ensure the written machine specific lockout procedures for the Hunter #1 and Hunter #2 molding machines located in the foundry area, properly identified the electrical lockout point for the equipment. The procedures stated that the electrical lockout point was the e-stop button which is a control circuit.