Violation Detail
Standard Cited: 19100036 H02 Design and construction requirements for exit routes.
Inspection Nr: 1448440.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,424.00
Current Penalty: $3,096.80
Issuance Date: 01/27/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 02/10/2020
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 02/23/2020
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/23/2020 | $3,096.80 | 02/10/2020 | Serious | |
| Penalty | Z: Issued | 01/27/2020 | $4,424.00 | 02/10/2020 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.36(h)(2): The outdoor exit route was not covered and snow or ice had accumulated along the route, creating a slipping hazard: Boiler room rear exit: On or about December 3, 2019, the exit landing and ascending stairway leading out of the boiler room was covered with snow and ice.