Violation Detail
Standard Cited: 19260451 B01 General requirements.
This violation item has been deleted.
Inspection Nr: 1419848.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 11/06/2019
Initial Penalty: $4,057.00
Current Penalty: $0.00
Issuance Date: 10/10/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): R
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 11/06/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/06/2019 | $0.00 | 11/06/2019 | Serious | |
Penalty | Z: Issued | 10/10/2019 | $4,057.00 | 11/06/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) Rolling Plains Construction, Inc. at 2930 Pearl Street, Boulder, CO, 80301: On or about 7/31/2019, the employer did not ensure that an employee working on a Waco mobile scaffold was working safely in that the platform was not fully planked. The platform consisted of two planks set on a ladder rung, whole the primary working platform was not planked. The employer did not ensure that the working level platform was fully planked between the uprights and guardrail supports. An employee was spraying insulation while working on a 39 inch high Waco mobile scaffold, and this condition exposed this employee to fall hazards.