Violation Detail

Standard Cited: 19260752 D Site layout, site-specific erection plan and construction sequence.

This violation item has been deleted.

Inspection Nr: 1410403.015

Citation: 01001A

Citation Type: Serious

Abatement Status:  

Initial Penalty: $13,260.00

Current Penalty: $0.00

Issuance Date: 12/20/2019

Nr Instances: 1

Nr Exposed: 3

Abatement Date: 01/17/2020

Gravity: 10

Report ID: 0418400

Contest Date: 02/11/2020

Final Order: 03/21/2022

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty J: ALJ Decision 03/21/2022 $0.00 01/17/2020 Serious  
Penalty C: Contested 02/11/2020 $13,260.00 01/17/2020 Serious  
Penalty Z: Issued 12/20/2019 $13,260.00 01/17/2020 Serious  

Text For Citation: 01 Item/Group: 001A Hazard:

29 CFR 1926.752(d): All hoisting operations in steel erection were not pre-planned to ensure that the requirements of 29 CFR 1926.753(d) were met: A) Hotel lobby area, on or about June 23, 2019, and or times prior to, the employer did not adequately preplan the lift of a grappler by a winch. The thickness and strength of the east and west side girders where the padeyes were attached was not determined before attaching the padeyes or making the lift, exposing employees to a struck by hazard.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.