Violation Detail
Standard Cited: 19260416 A03 General requirements.
Inspection Nr: 1405925.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $12,500.00
Issuance Date: 11/26/2019
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/23/2019
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 12/19/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/19/2019 | $12,500.00 | 12/23/2019 | Serious | |
Penalty | Z: Issued | 11/26/2019 | $13,260.00 | 12/23/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(3): Before work began, the employer did not ascertain by inquiry, direct observation, or by instruments, whether any part of an energized electric power circuit, exposed or concealed, was so located that the performance of the work could bring any person, tool, or machine into pysical or electrical contact with the electric power circuit. On or about June 1, 2019 at the worksite located at 1412 Milstead Avenue in Conyers, Georgia employees for the company were exposed to electrical hazards, when the employer failed to ensure the area was safe of electrical hazards by means listed above prior to the start of demolishing work in the work area.