Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1392955.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 09/25/2019
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/22/2019
Gravity: 10
Report ID: 0418400
Contest Date: 10/21/2019
Final Order: 01/01/2021
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/01/2021 | $13,260.00 | 10/22/2019 | Serious | |
| Penalty | C: Contested | 01/24/2020 | $13,260.00 | 10/22/2019 | Serious | |
| Penalty | Z: Issued | 09/25/2019 | $13,260.00 | 10/22/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. a). Further Processing Plant, Line #: 1 and 2 - On or about and times prior to March 27, 2019, energy control procedures (i.e. lockout/tagout procedures) were not utilized when employees removed blockages from metal piping that was connected to the UNIBLOC section of Nothum Batter Pro machines (model: Mod Pro PD 450), thus exposing employees to a struck-by hazard.