Standard Cited: 19100269 P04 III B Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1392552.015
Citation: 01001A
Citation Type: Other
Abatement Date: 10/24/2019 2
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 09/27/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0419700
Contest Date: 10/25/2019
Final Order: 04/30/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 04/30/2021 | $13,260.00 | 10/24/2019 | Other | |
Penalty | C: Contested | 10/25/2019 | $13,260.00 | 10/24/2019 | Serious | |
Penalty | Z: Issued | 09/27/2019 | $13,260.00 | 10/24/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.269(p)(4)(iii)(B): The mechanical equipment was not insulated for the voltage involved, or the mechanical equipment was not positioned so that its uninsulated portions could not approach the energized lines or equipment any closer than the minimum approach distances, established by the employer under paragraph (l)(3)(i) of this section: a. On or about April 9, 2019, the ALTEC Model LR760E70 aerial lift vehicle was positioned so that the uninsulated length of the lower arm of the knuckle boom could contact the 14.4 kV power line, thereby violating the minimum approach distance required by 1910.269(l)(3)(i) and exposing ground personnel to an electrocution hazard.