Violation Detail
Standard Cited: 19260651 B04 Specific Excavation Requirements.
This violation item has been deleted.
Inspection Nr: 1369999.015
Citation: 01001A
Citation Type: Serious
Abatement Status:
Initial Penalty: $11,934.00
Current Penalty: $0.00
Issuance Date: 07/03/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 07/30/2019
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 07/29/2019
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/29/2019 | $0.00 | 07/30/2019 | Serious | |
| Penalty | Z: Issued | 07/03/2019 | $11,934.00 | 07/30/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.651(b)(4): While the excavation was opened, underground installations were not protected, supported or removed as necessary to safeguard employees: a) 3475 Piedmont Rd, Atlanta (Construction site) - On or about 1/7/2019, the employer exposed employees to electrical shock and arch flash hazards in that the underground energized electrical power lines were not protected from contact while employees were inside an open excavation cutting and removing three underground power lines to install a new 8 inch ductile iron pipe water supply line inside the trench.
Translate