Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1368097.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,789.00
Current Penalty: $1,718.00
Issuance Date: 05/09/2019
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 05/29/2019
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 06/04/2019
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/04/2019 | $1,718.00 | 05/29/2019 | Serious | |
Penalty | Z: Issued | 05/09/2019 | $3,789.00 | 05/29/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. On or about December 26, 2018, the company's lockout/tag out procedures did not include specific procedural steps or additional methods of instructions for the control of potentially hazardous energy sources when clearing jams and/or performing maintenance and servicing tasks on the following machinery, to include but not limited to: a) AIDA #9 121 ton mechanical power press which has electrical, hydraulic, and pneumatic energy. b) WARCO #11 100 ton mechanical power press which has electrical and pneumatic energy. c) Danly 60 ton mechanical power press which has electrical and pneumatic energy.