Violation Detail
Standard Cited: 19260451 F03 General requirements.
Inspection Nr: 1358191.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,772.00
Current Penalty: $2,772.00
Issuance Date: 11/06/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 11/26/2018
Gravity: 5
Report ID: 0830500
Contest Date:
Final Order: 12/05/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 11/06/2018 | $2,772.00 | 11/26/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(f)(3): Scaffolds and scaffold components were not inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity: NB Siding Construction LLC at 2152 Fountain Cir. Erie, CO 80516: On or before 11/1/18 the creating and exposing employer did not protect employees from injury in that a pump jack scaffold was not inspected prior to use at the beginning of each shift or after an occurrence which could have affected the structural integrity of the scaffold. An employee fell 15 feet after the scaffold decking gave way under him. This condition exposed employees to a fall hazard of 15 feet.
Translate