Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1355590.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,978.00
Current Penalty: $1,989.00
Issuance Date: 03/11/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 03/25/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/25/2019 | $1,989.00 | Serious | ||
Penalty | Z: Issued | 03/11/2019 | $3,978.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a. On or about 10/24/2018, at the jobsite, the supervisor and subcontractor employees were installing clay bricks and foam board while working from a 3 tiered tubular welded scaffolding that was not fully planked on the working levels.