Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1354086.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,391.00
Current Penalty: $5,543.00
Issuance Date: 11/16/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 12/13/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/13/2018 | $5,543.00 | Serious | ||
| Penalty | Z: Issued | 11/16/2018 | $7,391.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(i): Procedures shall be developed, documented and utilized for the control of potentially hazardous energy when employees are engaged in the activities covered by this section. On or about October 11, 2018, the employer did not ensure energy control procedures were utilized when a maintenance worker performed service and maintenance (inspecting) operations of the Evisceration Line #5 Drive Motor.
Translate