Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1351915.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $7,760.00
Issuance Date: 01/14/2019
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/08/2019
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 01/31/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/31/2019 | $7,760.00 | 02/08/2019 | Serious | |
| Penalty | Z: Issued | 01/14/2019 | $12,934.00 | 02/08/2019 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On the second deck of the building, where employees contacted a bull float that became energized due to the proximity of electric power circuits, exposing employees to electrical hazards.