Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1348392.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,656.00
Current Penalty: $2,793.60
Issuance Date: 12/18/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/31/2018
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 12/28/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/28/2018 | $2,793.60 | 12/31/2018 | Serious | |
| Penalty | Z: Issued | 12/18/2018 | $4,656.00 | 12/31/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On or about 9/11/2018, on the south side of the house located at 1473 Paley Cir. S.E. Palm Bay, FL, an employee was exposed to an electrocution hazard while carrying a J Channel of approximately 12 feet long while climbing up an extension ladder. The piece of J channel contacted a 13.2kV phase to ground overhead power line.
Translate