Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1345962.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,641.00
Current Penalty: $7,950.00
Issuance Date: 10/03/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 10/30/2018
Gravity: 10
Report ID: 0317500
Contest Date:
Final Order: 10/30/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/30/2018 | $7,950.00 | 10/30/2018 | Serious | |
Penalty | Z: Issued | 10/03/2018 | $11,641.00 | 10/30/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Facility, 200 Utah Street, Harmony, PA 16037, On or before September 11, 2018, the employer did not conduct an annual audit of their program to ensure it was being implemented on equipment such as the Cincinnati Shear.