Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1319723.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,633.00
Current Penalty: $4,579.80
Issuance Date: 07/02/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/25/2018
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 07/27/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/27/2018 | $4,579.80 | 07/25/2018 | Serious | |
| Penalty | Z: Issued | 07/02/2018 | $7,633.00 | 07/25/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. (a) ID Blaster and Staging Rack - On or about May 30, 2018 the employer did not develop a energy control procedure for the cleaning of shot material around the machinery.
Translate