Standard Cited: 19100036 D03 Design and construction requirements for exit routes.
Inspection Nr: 1317987.015
Citation: 01001A
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $3,880.00
Current Penalty: $1,000.00
Issuance Date: 08/20/2018
Nr Instances: 1
Nr Exposed: 50
Abatement Date:
Gravity:
Report ID: 0522300
Contest Date: 09/12/2018
Final Order: 12/21/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/21/2018 | $1,000.00 | Other | ||
Penalty | C: Contested | 09/13/2018 | $3,880.00 | Serious | ||
Penalty | Z: Issued | 08/20/2018 | $3,880.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.36(d)(3): An exit route door may be locked from the inside only in mental, penal, or correctional facilities and then only if supervisory personnel are continuously on duty and the employer has a plan to remove occupants from the facility during an emergency: On or about May 23, 2018, in the finishing and dipping department, there was an exit discharge door that was locked and dead bolted. The door could not be opened from the inside without unlocking both the door handle and dead bolt. There was no panic bar.