Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1299054.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 09/05/2018 2
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 08/29/2018
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 09/20/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/20/2018 | $12,934.00 | 09/05/2018 | Serious | |
Penalty | Z: Issued | 08/29/2018 | $12,934.00 | 09/05/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedures did not clearly and specifically outline the steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy. Establishment - The lockout/tagout procedure used for changing out the cables and sheave on the P&H Gantry Crane did not include specific procedural steps for blocking or securing the carrier beam.