Violation Detail
Standard Cited: 19100107 C02 Spray finishing using flammable and combustible materials.
Inspection Nr: 1298174.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 09/07/2018 2
Initial Penalty: $6,467.00
Current Penalty: $4,525.00
Issuance Date: 06/22/2018
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 07/11/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/11/2018 | $4,525.00 | 09/07/2018 | Serious | |
Penalty | Z: Issued | 06/22/2018 | $6,467.00 | 07/19/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.107(c)(2): 29 CFR 1910.107(c)(2): Open flame or spark producing equipment was within a spraying area and/or within 20 feet thereof, was not separated by a partition: (a) PAINT SPRAY BUILDING - Employee(s) performed paint spraying operations on logging equipment parts, and there was non-approved electrical equipment being utilized within three to ten feet of paint spraying operations, including 20 fluorescent lighting fixtures, two 110 volt electrical outlets, two electrical light switches, and a 30 inch industrial fan, on or about May 2, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.