Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1294192.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,934.00
Current Penalty: $12,934.00
Issuance Date: 07/09/2018
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 08/13/2018
Gravity: 10
Report ID: 0522300
Contest Date:
Final Order: 08/03/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/03/2018 | $12,934.00 | 08/13/2018 | Serious | |
Penalty | Z: Issued | 07/09/2018 | $12,934.00 | 08/13/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29CFR 1910.147(c)(4)(ii)[A], 29CFR 1910.147(c)(4)(ii)[B], 29CFR 1910.147(c)(4)(ii)[C], and 29CFR 1910.147(c)(4)(ii)[D]: On or about February 19, 2018, the employer failed to identify a pneumatic energy source on the M964, L12 Hydraulic Cutoff Machine as part of their energy control lock out tag out procedures.