Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1285525.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,054.00
Current Penalty: $4,250.00
Issuance Date: 05/24/2018
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 11/20/2018
Gravity: 10
Report ID: 0213900
Contest Date: 09/06/2018
Final Order: 01/30/2019
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/30/2019 | $4,250.00 | 11/20/2018 | Serious | |
Penalty | C: Contested | 09/10/2018 | $9,054.00 | 06/20/2018 | Serious | |
Penalty | Z: Issued | 05/24/2018 | $9,054.00 | 06/20/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29CFR 1910.147(c)(4)(ii)[A], 29CFR 1910.147(c)(4)(ii)[B], 29CFR 1910.147(c)(4)(ii)[C], and 29CFR 1910.147(c)(4)(ii)[D]: a) JVK Operations, Ltd. - Throughout the plant : The employer did not develop specific procedures for all types and forms of hazardous energy associated with each type of machinery including but not limited to: Washing tunnels, Washer extractor presses, Dryers, Folding machines, Ironer machines, etc., occurred on or about 12/19/2017.