Violation Detail
Standard Cited: 19260251 A06 Rigging equipment for material handling.
Inspection Nr: 1265460.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,467.00
Current Penalty: $1,880.00
Issuance Date: 03/01/2018
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/07/2018
Gravity: 5
Report ID: 0134000
Contest Date:
Final Order: 03/20/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/20/2018 | $1,880.00 | 03/07/2018 | Serious | |
Penalty | Z: Issued | 03/01/2018 | $6,467.00 | 03/07/2018 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.251(a)(6): "Inspections." Each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a competent person designated by the employer. Additional inspections shall be performed during sling use, where service conditions warrant. Damaged or defective slings shall be immediately removed from service. Location: Mass Avenue & Locust Street, Lexington, MA: On or about 9/11/2017, the alloy steel chain sling used by employees to lift material was not inspected by a competent person before use.