Violation Detail
Standard Cited: 19100254 D03 Arc welding and cutting.
Inspection Nr: 1253919.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $8,872.00
Issuance Date: 11/28/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/18/2017
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 12/18/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/18/2017 | $8,872.00 | 12/18/2017 | Serious | |
| Penalty | Z: Issued | 11/28/2017 | $12,675.00 | 12/18/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.254(d)(3): Special attention was not given to safety ground connections of portable welding machines: On or about August 4, 2017, in the pump house, employees required to use the Miller Dialarc 250 AC/DC were exposed to electrical shock from cables not grounded.
Translate