Violation Detail
Standard Cited: 19260404 B01 II Wiring design and protection.
Inspection Nr: 1240638.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,622.00
Current Penalty: $2,173.00
Issuance Date: 11/08/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/17/2017
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 11/28/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/28/2017 | $2,173.00 | 11/17/2017 | Serious | |
| Penalty | Z: Issued | 11/08/2017 | $3,622.00 | 11/17/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.404(b)(1)(ii): On a construction site, where an assured equipment grounding program was not utilized, all 120-volt, single-phase, 15 and 20 ampere receptacle outlets which were not a part of the permanent wiring of the building or structure and which are in use by employees did not have approved ground fault circuit interrupters for personal protection: (a) Tabor Machine Company: On or about June 16, 2017, and times prior, employees were using a Bostitch hammer drill, plugged into a receptacle with a 10/3 gauge extension cord that was not GFCI protected.
Translate