Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1231790.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $8,000.00
Issuance Date: 10/31/2017
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 11/13/2017
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order: 11/22/2017
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/22/2017 | $8,000.00 | 11/13/2017 | Serious | |
| Penalty | Z: Issued | 10/31/2017 | $11,408.00 | 11/13/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(d)(2): Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. (a) Chicago Die Cutting Press 770: On or about May 10, 2017 the mechanical press was not turned off or shut down using the procedures established for the press prior to the press operator setting a die. This exposed the press operator to crushing hazards and amputation injury.
Translate