Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1230628.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,234.00
Current Penalty: $6,463.80
Issuance Date: 09/20/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 10/02/2017
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 09/29/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/29/2017 | $6,463.80 | 10/02/2017 | Serious | |
| Penalty | Z: Issued | 09/20/2017 | $9,234.00 | 10/02/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: (a) On or about 04/25/2017 - Press & Trim Department, Pacific 90 Ton Trim Press Brake, Model J135-21H, Serial #9401, employees breaking material to form an approximately 3/8 inch hem were exposed to amputation injuries at the point of operation.
Translate