Violation Detail
Standard Cited: 19100147 D04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1228249.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,696.00
Current Penalty: $5,772.00
Issuance Date: 06/21/2017
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 07/26/2017
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 07/03/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/03/2017 | $5,772.00 | 07/26/2017 | Serious | |
| Penalty | Z: Issued | 06/21/2017 | $7,696.00 | 07/26/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(d)(4)(i): Lockout or tagout devices were not affixed to each energy isolating device by authorized employees: (a) 400 Seaks Run Road, Glen Rock Pennsylvania, 50 gallon reactor - The employer did not ensure that when employees were troubleshooting, testing or repositioning a machine that a device was affixed to each energy source, on or about April 25, 2017. (b) 400 Seaks Run Road, Glen Rock Pennsylvania, 50 gallon reactor - The employer did not ensure that when employees preformed maintenance on a machine that a device was affixed to each energy source, on or about April 27, 2017. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.
Translate