Violation Detail
Standard Cited: 19100147 E01 The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1212608.015
Citation: 01001A
Citation Type: Serious
Abatement Status:
Initial Penalty: $7,696.00
Current Penalty: $0.00
Issuance Date: 06/16/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 06/22/2017
Gravity: 5
Report ID: 0523400
Contest Date: 07/11/2017
Final Order: 11/20/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 11/20/2017 | $0.00 | 06/22/2017 | Serious | |
| Penalty | C: Contested | 07/13/2017 | $7,696.00 | 06/22/2017 | Serious | |
| Penalty | Z: Issued | 06/16/2017 | $7,696.00 | 06/22/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(e)(1): The machine or equipment: The work area was not inspected to ensure that machine or equipment components were operationally intact. (a) Horizontal Boring Mill F0113: Maintenance employees did not ensure that the drive pulley was operationally intact prior to lockout devices being temporarily removed to conduct testing of belt tracking on damaged servo motor pulley.