Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1204407.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,070.00
Current Penalty: $2,535.00
Issuance Date: 03/13/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/27/2017
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 03/30/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/30/2017 | $2,535.00 | 06/27/2017 | Serious | |
| Penalty | Z: Issued | 03/13/2017 | $5,070.00 | 04/27/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i): The employer shall conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirements of this standard are being followed. a) Employer did not conduct a periodic inspection of the energy control procedures annually, for equipment such as but not limited to; the D Stacker machine.