Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1197782.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 04/21/2017 2
Initial Penalty: $7,696.00
Current Penalty: $5,196.00
Issuance Date: 04/06/2017
Nr Instances: 1
Nr Exposed: 7
Related Event Code (REC): A
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 05/02/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/02/2017 | $5,196.00 | 04/21/2017 | Serious | |
Penalty | Z: Issued | 04/06/2017 | $7,696.00 | 04/21/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Palram 2000, Inc., P3 - On or about December 13, 2016, the employer did not conduct a periodic inspection of their energy control procedure at least annually to ensure that the procedure and the requirement were being followed.